City of Lockport

Summit and Runyan Drive Roadway Improvement Project

DesignTek prepared the civil engineering plans for this roadway resurfacing and reconstruction project for the City of Lockport.  The improvements included 2,800 lineal feet of roadway resurfacing and reconstruction, sidewalk replacement, new watermain, storm sewer, and utility relocations.  DesignTek was responsible for surveying the limits of the project and assessing the portions of roadway that needed full depth replacement as opposed to portions that needed to be resurfaced.  Coordination with the City staff, dry utility companies and the affected residents was a big component of this project.  The City wanted to ensure that this project went as smoothly as possible and minimized the disruption to the residents.  DesignTek was also responsible for creating the project bid manual and helping with the bid process.