This project had two distinct aspects. First, the parish is demolishing a section of their current facilities and adding a larger structure in the location of the removed building. This work consists of site grading, utility service design, and downstream storm water runoff evaluation due to storm water management not being required. The second scope of this project involves providing ADA accessible routes at the main entrance to the church. This design requires reconstruction of large sections of the existing parking lot, as well as detailed grading and analysis of the accessible routes to insure ADA compliance.